The FPBGSA seeks public review and input on its Draft GSPs for the Fillmore and Piru Basins. Public comments will be considered as the agency prepares a Final GSP for submittal to the California Department of Water Resources (DWR). The following outlines the public review process and provides guidelines for submitting comments.
- Each Draft GSP will be available for a 60-day public review period:
- Fillmore Draft GSP: August 9, 2021 through October 9, 2021.
- Piru Draft GSP: August 23, 2021 through October 23, 2021.
- Methods for submitting written comments:
- Preferred method: fill out the on-line comment form below.
- It is advisable to prepare your comments in a word processing file and then upload your comments to the form.
- Send a comment letter: § Email to Eva Ibarra at Evai@unitedwater.org, or
- Mail it to:
- United Water Conservation District, attn: Eva Ibarra
1701 N. Lombard St. Suite 200, Oxnard, CA 93030
If mailing, please allow sufficient time for it to be received by the end of the comment period.
- United Water Conservation District, attn: Eva Ibarra
- Preferred method: fill out the on-line comment form below.
- Please follow these suggested guidelines as you prepare your comments:
- For each comment, identify the GSP (Fillmore or Piru) and the section, page, and line numbers the comment references
- Make sure your comment is clear and specific
- Constructive comments and suggestions (i.e., how the document can be improved) are appreciated
- If you need any assistance in accessing the GSP documents or submitting your comments, please contact Eva Ibarra at Evai@unitedwater.org.